The no.1 cabin airframe was preliminary assembled. The two longitudinal pieces aligned perfectly. The team has work to do on the windows frames of the right half of the cabin. After the completion of this the cabin will be finally assembled at the end of this week. Cabin no.1 will be used for the parachute test during the Mission 6.
Bookmark/Search this post with: